Product Introductions
The Salt And Pepper Refillable Grinders is designed for seasoning brands, spice packaging wholesalers, and OEM food packaging projects requiring a lightweight refillable grinder bottle for retail and bulk supply. This model combines a transparent PET bottle with a durable PC grinder head structure, helping reduce transportation weight while maintaining stable grinding performance during long-term use. With a 100ml capacity and compact φ42×130mm size, the grinder is suitable for black pepper, sea salt, pink salt, chili flakes, and mixed dry seasonings used in supermarket packaging, private label programs, and wholesale distribution projects.

Product Parameters
| Item | Details |
|---|---|
| Model | H51-266 |
| Material | PC + PET |
| Bottle Diameter | φ42mm |
| Height | 130mm |
| Capacity | 100ml |
| Bottle Type | Refillable |
| Application | Salt, Pepper, Spice Packaging |
| OEM Service | Supported |
| Logo Printing | Supported |
| Packaging | Export Carton |
| Sample | Available |
Quality Control

The Salt And Pepper Refillable Grinders is managed under a staged inspection system covering material control, molding output, assembly fitting, and final packaging, ensuring stable consistency across mass production batches. Key checks include PET and PC material verification, bottle transparency and dimensional accuracy testing, grinder cap torque and rotation performance, as well as random sealing and packaging condition inspections before shipment.
For export orders, inspection records and quality control data can be aligned with customer requirements to support traceability and consistency across production runs.
Certifications

Lead Time
The Salt And Pepper Refillable Grinders Wholesales is scheduled through a production system that separates sampling, standard output, OEM customization, and new tooling projects, allowing each order to be managed according to its processing requirements rather than a single fixed timeline. For routine stock configurations, samples can usually be prepared within a short cycle after confirming specifications such as bottle size, cap fit, and grinding mechanism compatibility. Standard production is arranged based on existing tooling conditions and material availability, while OEM orders involving color adjustment, logo application, or packaging changes are allocated additional time for setup and pre-production confirmation.
For projects using existing molds, production planning is typically streamlined since bottle dimensions, neck structure, and assembly parameters are already stabilized in the system. This allows faster transition from sample confirmation to batch production. When new mold development is required, lead time depends on structural complexity, cavity design, and sample validation requirements before mass production approval. In all cases, production scheduling is finalized only after sample confirmation and deposit arrangement, ensuring that both manufacturing preparation and export packaging requirements are aligned before order execution.

Mold Availability
The Salt And Pepper Refillable Grinders Factory is already supported with existing production molds, allowing production to be arranged more efficiently for standard wholesale projects and repeat OEM orders. Using existing mold structures helps reduce additional tooling costs and shortens the preparation stage before mass production, which is more suitable for customers requiring stable supply schedules and faster order turnaround. The current mold configuration has been used for regular production programs involving refillable seasoning packaging, helping maintain consistency in bottle dimensions, cap fitting, and assembly compatibility during bulk manufacturing.
For buyers developing exclusive packaging projects, customized mold development can also be arranged based on technical drawings, reference samples, or specific packaging requirements. This includes adjustments to bottle shape, bottle height, neck structure, cap appearance, or customized branding details depending on project requirements. Mold production schedules are usually determined according to structure complexity, cavity quantity, and sampling confirmation procedures. Standard projects using existing molds can normally move directly into sample arrangement and production planning, while newly developed molds generally require approximately 20–35 working days for tooling preparation and sample evaluation before production approval.
FAQ
Q: Do you support logo printing?
A: Yes, we support silk screen printing, labeling, and sleeve packaging depending on design requirements and production method.
Q:What is the lead time for production?
A: For standard orders, production usually takes around 15–25 working days after sample confirmation. OEM projects may require additional time.
Q:Do you support FOB or CIF terms?
A: Yes, common trade terms such as FOB, CIF, EXW, and DDP can be arranged based on buyer requirements.
Q:What quality control is applied before shipping?
A: Each batch is checked for assembly fit, bottle integrity, grinding performance, and packaging condition before export.


